ODM Lighting Development Process: From Brief to Production
Follow the controlled stages used to turn a lighting project brief into an approved production configuration. The process defines what the customer prepares, what ANOVA reviews and what each stage must deliver before the next decision. Application details, drawings, target performance, installation constraints, market requirements and expected volume form the starting inputs; engineering, prototype validation and production preparation then create a traceable route to manufacturing.
Send Your Project Brief
ANOVA Engineering
Customer Inputs and Stage Deliverables Keep the Process Moving
This page explains the ODM workflow rather than the full range of customization options. Customers prepare the available application, installation, performance, market, quantity and timing information; each review stage then produces a defined output for the following decision.

Stage 1: Project Requirements and Customer Inputs
We begin with the application, operating environment, installation constraints, target market, performance goals, expected quantity and unacceptable failure modes.
- Application review
- Environment definition
- Target specification
- Volume planning

Stage 2: Engineering Design Direction
Materials, finishes, enclosure, optics, electrical configuration, thermal behavior and manufacturing feasibility are developed as one product system.
- Material selection
- Mechanical design
- Thermal review
- Electrical configuration

Stage 3: Prototype Validation and Adjustments
Prototype samples make the agreed dimensions, assembly, installation, finish and lighting performance available for practical review and adjustment.
- Sample development
- Fit and assembly
- Installation review
- Design adjustment

Stage 4: Production Preparation and Approval
Testing findings, the approved configuration, inspection requirements and controlled documentation are reviewed before the project is released for production.
- Validation review
- Production documentation
- Quality checkpoints
- Configuration approval
A Controlled Route
ODM Lighting Development Process Deliverables
Four decision stages connect customer inputs with an approved product configuration, validation record and production-ready documentation.
- 01Requirement Analysis
- 02Engineering Design
- 03Prototype Validation
- 04Production Preparation
Deliverables at Each Stage
- 01Requirement Analysis
- Reviewed application brief, operating conditions, target specification and open technical questions.
- 02Engineering Design
- Agreed material, mechanical, optical, electrical and thermal design direction.
- 03Prototype Validation
- Prototype review record, confirmed adjustments and applicable validation findings.
- 04Production Preparation
- Approved configuration, inspection checkpoints and controlled production documentation.